2012Forum Follow Focus
Verfügbarkeit und Vorlaufzeiten für Preston Follow Focus Geräte im Jahr 2012
14 Jahre alt. Geräte und Preise können sich seitdem geändert haben.
Was die Diskussion ergab
- New Preston Microforce Digital Control II and DM-2 Digital Motor units experienced long manufacturing lead times from authorized distributors
- Direct ordering from Preston's Santa Monica location was suggested as an alternative to going through distributors with extended waiting lists
- Lead times for new Preston Digital Microforce equipment were reported to be between 8 to 10 weeks or longer depending on distributor stock levels
- Used equipment in mint condition was presented as a faster acquisition option compared to ordering new items
Hängt ab von
- Information is from 2012 and current availability may differ significantly
- Lead time reports were anecdotal and based on individual quotes from distributors at that specific time
- Regional variations existed, with some distributors experiencing longer waits than others
Bauteile
Dieselben Geräte oder Bauteile
- 2026Fokussieren und Zoomen Sie sich während des Betriebs, insbesondere bei Live-ShowsOperator practice
- 2026Wechseln eines ARRI ALEXA 35 zwischen Stativ/Studio und Steadicam® Montage: Grundplattenwahl und schnellster Workflow.FacebookSteadicam operators group
- 2025LC-1 (Lens Control-1) Follow Focus-System: verdrahtete Architektur, Motoren und frühe Betriebserfahrung (1990er Jahre).FacebookThe Steadicam Group
- 2024Modifikationen an einem Steadicam Scout-Rig für erweiterte Stromverteilung und KonnektivitätGeneral Discussion