What the thread found
- New Preston Microforce Digital Control II and DM-2 Digital Motor units experienced long manufacturing lead times from authorized distributors
- Direct ordering from Preston's Santa Monica location was suggested as an alternative to going through distributors with extended waiting lists
- Lead times for new Preston Digital Microforce equipment were reported to be between 8 to 10 weeks or longer depending on distributor stock levels
- Used equipment in mint condition was presented as a faster acquisition option compared to ordering new items
Depends on
- Information is from 2012 and current availability may differ significantly
- Lead time reports were anecdotal and based on individual quotes from distributors at that specific time
- Regional variations existed, with some distributors experiencing longer waits than others
Parts
Same gear or parts
- 2026Pulling focus and zoom yourself while operating, especially on live showsOperator practice
- 2026Swapping an ARRI ALEXA 35 between tripod/studio and Steadicam® mounting: baseplate choice and fastest workflow.FacebookSteadicam operators group
- 2025LC-1 (Lens Control-1) follow focus system: wired architecture, motors, and early operational experience (1990s).FacebookThe Steadicam Group
- 2024Modifications to a Steadicam Scout rig for expanded power distribution and connectivityGeneral Discussion