SteadiHub
2012Follow Focus forum

Availability and lead times for Preston follow focus equipment in 2012

14 years old. Gear and prices may have changed since.

What the thread found

  • New Preston Microforce Digital Control II and DM-2 Digital Motor units experienced long manufacturing lead times from authorized distributors
  • Direct ordering from Preston's Santa Monica location was suggested as an alternative to going through distributors with extended waiting lists
  • Lead times for new Preston Digital Microforce equipment were reported to be between 8 to 10 weeks or longer depending on distributor stock levels
  • Used equipment in mint condition was presented as a faster acquisition option compared to ordering new items

Depends on

  • Information is from 2012 and current availability may differ significantly
  • Lead time reports were anecdotal and based on individual quotes from distributors at that specific time
  • Regional variations existed, with some distributors experiencing longer waits than others

Parts

Follow Focus

Same gear or parts

  1. 2026Pulling focus and zoom yourself while operating, especially on live showsOperator practice
  2. 2026Swapping an ARRI ALEXA 35 between tripod/studio and Steadicam® mounting: baseplate choice and fastest workflow.FacebookSteadicam operators group
  3. 2025LC-1 (Lens Control-1) follow focus system: wired architecture, motors, and early operational experience (1990s).FacebookThe Steadicam Group
  4. 2024Modifications to a Steadicam Scout rig for expanded power distribution and connectivityGeneral Discussion
Read the original threadAsk about this threadThe answer cites the archive